The client is an essential oil company, providing natural solutions for healthy living. Understandably, the new office design incorporated a variety of natural finishes and details for the right look and feel.
Vtec’s texture range met the natural requirement with ease and the stone wall panels in Strata White were used as a design statement in the reception area, reflecting the client’s brand and helping to portray their clean-living and wellbeing brand, setting the tone for visitors.
The panels were an ideal backdrop for company signage to be added.
Throughout the design, the execution is impeccable with high quality fixtures and colourful details bringing the office to life.
Summary
Product Used: Strata White from the Texture Range
Vtec Strata Panels are part of our stunning Texture Range that provides high durability, ease of installation and can be applied to curved surfaces. Superb replication of the original surface and consistently high manufacturing standards make Texture Panels a popular choice among designers, specifiers and business owners.
Please browse our projects page for examples of other applications, or contact our Technical Team on 03307 00 00 30 for more details.
Workplace that inspires Happiness
The developers of these serviced offices firmly believe in the connection between happiness and productivity. They have, therefore, set to design "the happiest place to work in London". The result is an outstanding space that is bound to keep you smiling.
PARTY CAVES – SAFARI PARK
This beloved UK safari park has used Vtec Canyon Stone panels to transform the existing cafe area into amusing and quirky party caves. The durability of the panels and almost total absence of maintenance has enabled myriads of visitors to enjoy their birthday parties in this for many years to come.
Luxurious Spa in a 5 star hotel
This Luxurious Spa in a 5-star hotel in Edinburgh has benefited from our StripStone Texture panels. They have been chosen for their fantastic quality and ease of installation allowing contractors to carry out works whilst the Spa remained operational.